Sign In | Join Free | My entremaqueros.com
China Guangzhou HongCe Equipment Co., Ltd. logo
Guangzhou HongCe Equipment Co., Ltd.
We provide you with industry leading test equipment, advanced online system and solutions–anywhere in the world.
Verified Supplier

12 Years

Home > IEC Test Equipment >

IEC 61869-2 Current Transformer Testing Equipment For Ratio Error And Phase Displacement Test

Guangzhou HongCe Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

IEC 61869-2 Current Transformer Testing Equipment For Ratio Error And Phase Displacement Test

Brand Name : HongCe

Model Number : DL-30

Certification : Calibration certificate(cost additional)

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T

Supply Ability : 1 Sets per month

Delivery Time : 40 days

Packaging Details : Plywood

Product name : Current Transformers Test Apparatus

Feature : Accuracy (angular difference, ratio difference) test

International standard : IEC 61869-2

Electric current : Maximum current 10000A

Load : Up to 50VA

Power source : 220-240VAC,50Hz

Degree of accuracy : ±0.01%

Application : Measuring the ratio error and phase displacement of current transformers

Contact Now

IEC 61869-2 Current Transformer Testing Equipment For Ratio Error And Phase Displacement Test

Product application:

The Current Transformer Testing Equipment is used for Measuring the ratio error and phase displacement of current transformers.

Standard:

IEC 61869-2 Instrument transformers - Part 2: Additional requirements for current transformers

Current Transformer Testing Equipment configuration:

Current transformer tester, the product is composed of transformer calibrator, standard current transformer , current transformer load box, current booster and control device.

No. Item Specification Qty.
1 Transformer calibrator 2.0 1 set
2 Current transformer load box 5A, 1A 1 set
3 Standard current transformer 5-10000A/5A, 1A; 0.02S level 1 set
4 Current booster 0-5000A,20KVA 2 sets
5 Control device 40KVA 1 set
6 High current wire

2000A*3m*6 pieces

1000A*3m*1piece

500A*3m*2 pieces

250A*3m*2 pieces

100A*3m*2 pieces

1 set
7 Secondary current voltage line 1 set

Features:

Accuracy (angular difference, ratio difference) test, secondary open circuit test;

Multi-testing at one time, automatic line change, range change;

Automatic identification of wiring errors, give sound and light alarm, and guide the abnormal position;

Especially suitable for CT, PT factory test, 2 minutes to complete the accuracy test of 12 CTs;

Customized output report format, results can be uploaded to the manufacturer's ERP system;

Good safety and high test efficiency;

Internal picture of equipment:

IEC 61869-2 Current Transformer Testing Equipment For Ratio Error And Phase Displacement Test


Product Tags:

IEC 61869-2 Current Transformer Testing Equipment

      

Ratio Error Current Transformer Testing Equipment

      
 IEC 61869-2 Current Transformer Testing Equipment For Ratio Error And Phase Displacement Test Manufactures

IEC 61869-2 Current Transformer Testing Equipment For Ratio Error And Phase Displacement Test Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou HongCe Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)